Technology
in Composting |
|
Materials Handling |
|
Biological Process Optimization |
|
Odor Control |
|
Capital
Cost |
|
Increases with technology |
|
Operational Costs |
|
Decrease with technology |
|
Footprint (Area Required) |
|
Decreases with technology (usually) |
|
|
|
|
|
Low - Tech |
|
Windrow |
|
Mid - Tech |
|
Aerated Static Pile |
|
Aerated Compost Bins |
|
High - Tech (In-Vessel) |
|
Rotary Drum Composters |
|
Box/Tunnel Composting Systems |
|
Mechanical Compost Bins |
|
|
|
|
Long, narrow piles agitated/turned regularly |
|
Aeration by natural/passive air movement |
|
Better suited to larger volumes |
|
Composting Time: 3 - 6 Months |
|
|
|
|
|
|
|
|
Equipment Needed |
|
Grinder/Shredder |
|
Tractor/FEL |
|
Windrow Turner |
|
tractor-pulled |
|
self-propelled |
|
Screener |
|
Manual labor costs excessive without equipment |
|
|
|
|
|
|
Footprint |
|
One Acre Can Handle 4,000 - 7,000 CY Compost Mix |
|
Costs |
|
Site Prep -Site Specific |
|
Asphalt/Concrete Pad ($12 - $27/square yard) |
|
Equipment |
|
Grinder/Shredder : $3,500 |
|
Tractor/Front End Loader : $50K - $150K |
|
Windrow Turner : $30K - $200K |
|
Screeners : $50K - $180K |
|
|
|
|
|
|
Aeration Through Porous Floor Plates |
|
Composting Time: 2 - 3 Weeks |
|
Curing Time: 2 Months |
|
Durable Materials of Construction |
|
Equipment Needed: Front End Loader |
|
Vector/Vermin Control Needed With Food Wastes |
|
Capacities: 3 - 4 Days Food Waste + Bulking
Agent Per Bin |
|
|
|
|
12 Bins - Two Rows of 6 Bins |
|
Construction Cost - $40,000 |
|
Footprint - 50 SF per Bin |
|
Capacity of Each Bin - 36 Barrels (35 - gal.) of
Food Scraps |
|
Blowers - 980 CFM |
|
Aeration Plates - 2’ x 2’, $89 Each |
|
Filling/Emptying - With Bobcat |
|
|
|
|
Aeration Provided By Mechanical Blowers |
|
Can Shorten Composting time to 3 - 5 Weeks (followed by 30 days curing) |
|
|
|
|
Better Suited to Larger Volumes (landscape
debris and food waste) |
|
May Not Be Suited to Wastes That Need Mixing
During Composting, Like Food Wastes |
|
Difficult to Adjust Moisture Content During
Composting If Needed |
|
Odor Control Difficult With Positive Aeration |
|
Less Land Area Than Windrows, Still Labor
Intensive |
|
|
|
|
|
|
|
Rotation Mixes, Aerates Compost Mix |
|
Second - Stage Curing/Composting Needed |
|
Food Waste Grinding and Mixing With Bulking
Agent Needed Prior to Feeding Drum |
|
Recipe For Drum Composting Food Wastes: |
|
2 Parts Wood Chips |
|
1 Part Sawdust |
|
2 Parts Food Waste |
|
|
|
|
|
|
Type 616 Greendrum Composter with Patz 9427
Chopper |
|
Mounted on Tandem Axle Frame - moveable |
|
Footprint - 200-300 SF |
|
Daily Loading Rate - 2,000 - 5,000 Lbs/Day |
|
Operating Capacity - 11 CY |
|
Retention Time - 1 Week, Curing Time - 2 Months |
|
Cost -
Approx. $45,000 |
|
|
|
|
|
|
|
|
Wright Environmental Model 1500 (Model 750
shown) |
|
|
|
|
|
|
Capacity: 1500 lbs/day |
|
Composting Time: 4 Weeks |
|
Curing Time: 1 Month |
|
Labor - 2 Inmates |
|
Cost: $123,000 |
|
Disposal Savings: $33,000 / yr. (4-yr. Payback) |
|
Footprint: 50’ Long x 10’ Wide |
|
|
|
|
|
|
Green Mountain Technologies “Earth Tub” |
|
Modular Design, Batch Operation |
|
Capacity: 200 lbs/day |
|
Composting Time: 4 Weeks; Curing: 1 Month |
|
Footprint: 1 Parking Space |
|
Cost: $6,000 |
|
Labor: 1 Operator |
|
|
|
|
UNC - Asheville (Spring, 1999) |
|
Univ. of Georgia |
|
Hyatt Regency,
Chicago |
|
Vermont DEC |
|
Univ. of South Carolina |
|
Connecticut DEP |
|
Flushing Hospital, NY |
|
Texas A&M University |
|
|
|
|
|
Greendrum Rotary Drum Composter |
|
Bob Broom, RKB Enterprises (888) 475-2368 |
|
Wright Environmental Tunnel System |
|
Paul Roth, Innovative Environmental Systems |
|
(757)890-1354 |
|
Green Mountain Technologies Earth Tub |
|
John DeRham, (802) 368-7291 |
|
|
|
|
|
|
Factors To Consider In Selecting Technology |
|
Available Space |
|
Available Labor (Inmate or Staff) |
|
Vendor Previous Experience With Same Feedstocks |
|
Control of Odors, Vermin, and Vectors |
|
Life - Cycle Costs |
|
Capital Costs And All O&M Costs Over
Expected Life Of System |
|
Low - Tech: Lower Capital; Higher Operating
Costs |
|
High - Tech: Higher Capital; Lower Operating
Costs |
|