EXISTING N.C. MANAGEMENT REQUIREMENTS FOR ANIMAL WASTE SYSTEMS
Types of regulated animal operations
Components of a waste plan
Environmental concerns
Statute and rule requirements
Future issues
View PowerPoint Presentation
O200 OPERATIONS
Primarily liquid systems
>100 animal units
# animals          # facilities
Swine     250                   2200
Cattle      100                   300
Poultry    30,000              50
Horses      75                    4
DRY POULTRY LITTER
>  30,000 birds
~ 4,000 operations
General statute sets waste management requirement
TYPICAL WASTE MANAGEMENT SYSTEMS
Flush-lagoon-irrigation
Scrape-storage pond-honey wagon
Cleanout-drystack-spreader
COMPONENTS OF AN 0200  WASTE MANAGEMENT PLAN
O&M plan
Emergency action plan
Odor control
Insect control
Mortality disposal
LAGOON/HOLDING POND DESIGN
Storage needs - waste, rainfall, 24hr storm events, treatment volume, etc
Freeboard and consideration for emergency spillway
Liner
RUNOFF CONTROLS
Buffers
Setbacks
Diversions
Roof gutters
WASTE UTILIZATION PLAN
Amount of manure produced and used
Soils imfo
RYES for crops by field
N application rates
Waste application windows
Waste and soil testing
RECORD KEEPING
Waste application records
Waste and soil samples
Weekly lagoon level
Dry Litter Plan
Waste test
Soil test and apply lime
Apply litter at agronomic rates for N
Keep records of tests and application
Shared responsibility among producer, applicator and landuser
0200 PLAN REQUIREMENTS
Meet state adopted NRCS standards
Certified by technical specialist
NRCS STANDARDS FOR 0200
Waste storage pond  code 425
Waste treatment lagoon  code359
Waste utilization  code 633
TECHNICAL SPECIALISTS
Categories of designation, structural,WUP, irrigation etc
NRCS, SWCD, CES, NCDA&CS staff
P.E.s
Individuals designated by S&WCC
0200 OPERATION REQUIREMENTS
Certified plan
Permit general or individual
Operator in charge
OPERATOR IN CHARGE OF ANIMAL WASTE MANAGEMENT SYSTEM
Required for 0200 operations with liquid systems
Certified by the WPCSOCC
Training and testing requirements for initial certification
Continuing ed required

STATE OVERVIEW OF 0200 FACILITIES
Ensure plans are being followed
DWQ annual compliance inspection
DS&W annual operation review
Self reporting
Complaints

CURRENT ISSUES
P
Air Emissions
New technology
DEFICIENCIES AND VIOLATIONS THRU 9/00